Generator repair
Fault diagnosis and breakdown repair on diesel generators across Lagos — starting faults, alternator and AVR faults, fuel and cooling systems, control failures.
Emergency line open now · Apapa, Lagos
Rihanco services diesel sets from 20 to 800 kVA — Perkins, CAT, Volvo, Cummins, FG Wilson — plus solar, control panels, hydraulics and forklifts. Tell us the brand and the fault, and an engineer leaves Apapa.
Breakdown calls answered 24/7. Most of Lagos reached in 2–4 hours.
STEP 1
Brand, capacity and what it is doing — cranking but not starting, tripping on load, overheating, no output. Send a photo of the rating plate on WhatsApp if you are not sure.
STEP 2
We load the likely parts before leaving Apapa, so a common fault is fixed on the first visit instead of turning into a second trip across Lagos traffic.
STEP 3
You get the fault in writing with a price before any work starts. The repair is warrantied, and we tell you what will fail next if it is not addressed.
One workshop for the machines that keep a Lagos business running: diesel generators, solar, switchgear, hydraulics and material handling equipment.
Fault diagnosis and breakdown repair on diesel generators across Lagos — starting faults, alternator and AVR faults, fuel and cooling systems, control failures.
Siting, base and foundation, cabling, exhaust and canopy work, ATS integration, load testing and handover for sets from 20 kVA to 800 kVA.
Scheduled servicing on a monthly or annual contract: oil and filters, coolant, batteries, ATS test, load test and a written condition report each visit.
Full top and bottom-end overhauls on Perkins, Lister, John Deere and CAT engines — reboring, bearings, injectors, pumps, rebuild and bench testing.
Solar PV, inverter and battery systems from 1 kW to 500 kW, including hybrid setups that let the generator rest and cut your diesel bill.
Panel design and assembly, distribution boards, industrial facility wiring, power factor correction and fault finding for factories and warehouses.
Automatic transfer switches and manual changeover panels wired and tested, so the set picks up the load cleanly when the grid drops.
Pump and motor repair, cylinder reseal and rebuild, hose and ram replacement, and full system installation on plant and factory machinery.
Forklift servicing and repair for warehouses and the ports, plus diesel truck and plant engine work for transport fleets.
We size the system against your actual load, not a guess, then install panels, inverter and battery bank and set the generator to top up only when it must.
Panels built to the load they actually carry, labelled, tested and documented — so the next fault takes minutes to trace instead of a day.
What we take on, how long it takes, and what is covered. Anything outside this list, ask — we will tell you honestly if it is not our work.
| Service | Capacity | Brands | Turnaround | Warranty |
|---|---|---|---|---|
| Emergency breakdown | All capacities | All major brands | 2–4 hours | Yes |
| Generator repair | 20–800 kVA | Perkins, CAT, Volvo, Cummins | Same day | Yes |
| Generator installation | 20–800 kVA | All major brands | 24–48 hours | Yes |
| Preventive maintenance | All capacities | All major brands | Scheduled visit | Contract |
| Engine overhaul | 20–500 kVA | Perkins, Lister, John Deere | 3–7 days | Yes |
| Solar installation | 1 kW–500 kW | All panel and inverter brands | 3–7 days | Yes |
| Control panel and ATS | All sizes | All types | 48–72 hours | Yes |
Beside the port and the industrial estates. Short runs to Tin Can, Coconut, Oshodi, Ikeja and the Island instead of crossing Lagos to reach you.
A blackout costs a factory more per hour than the repair does. Our breakdown line is answered at night and on Sundays.
Technicians who diagnose the cause. If your AVR keeps failing, you will be told why, not sold a third AVR.
Price agreed before we open anything, genuine or quality-approved parts, and a warranty on the repair and the installation.
Generator, ATS, panel, solar and hydraulics under one company, so nobody blames the other trade when something trips.
Send a photo of the rating plate or a video of the fault. We often identify the problem before the vehicle leaves the yard.
Generator repair, solar and electrical call-outs across Lagos State, with installation and overhaul work nationwide. If your area is not listed, call — we almost certainly cover it.
Nationwide projects: Abuja, Port Harcourt, Ibadan, Kano, Warri and Benin City.
We dispatch from Apapa and reach most parts of Lagos in 2 to 4 hours, day or night. Call or WhatsApp +234 906 611 4686 with your generator brand, capacity and the fault so the engineer arrives carrying the right parts.
Perkins, Caterpillar (CAT), Volvo Penta, John Deere, Lister, FG Wilson, Cummins, Mikano and Tiger, from 20 kVA up to 800 kVA. That covers repair, overhaul, installation and scheduled maintenance.
It depends on the brand, the capacity and the fault, so we diagnose first and send a written quote. No work begins until you approve it, and the price covers parts, labour and the warranty on the job.
Yes. We size the system against your real load, then install rooftop or ground-mount solar PV, inverters, battery banks and hybrid solar-generator systems from 1 kW to 500 kW for homes, factories, hospitals and offices.
Monthly and annual contracts. Each visit covers oil and filter changes, coolant and battery checks, ATS testing, load testing and a written condition report — which is what stops a set failing in the middle of a blackout.
Our workshop is in Apapa, beside the port and the industrial estates we serve. We cover the whole of Lagos and travel nationwide for installations and major overhauls, including Abuja, Port Harcourt, Ibadan and Kano.
If the set is already down, call or WhatsApp instead of filling the form — it is faster.
The more detail you give, the more accurate the price.
24/7 emergency repair across Lagos and nationwide.